Relevant data and quantities:
Capacity (beds): 250 units
Nº of floors: 10
Construction area: 41,500 m2
Covered areas: 10,000 m2
Land area: 71,500 m2
Earthwork: 155,000 m3
Formwork: 90,000 m2
Concrete: 18,500 m3
Steel: 1,900 ton
Masonry: 70,000 m2
Transformer station 1500/380 Volts
Transformers 800 kVA: 3 units
Emergency group 550 kVA: 2 units
Lifts: 10 units
Thermal power station, air conditioning, heating and ventilation
Boilers 1,000,000 Kcal/h: 3 units
Chillers 440 kW. 2 un
centralized technical management
Network water and sewage
supply Central
Fire Central
deposit reserve and settlement: 300 m2
hot water tanks 2 x 4,000 l + 2 × 2500 l
treatment plant waste and infected water
Water treatment
Gases medicinal products (oxygen, vacuum, nitrous oxide and compressed air)
Kitchen (1300 meals a day)
Laundry (250 kg clothes/hour)
Sterilization center (steam autoclaves, washing and disinfection equipment)
Security, detection and fire fighting