Project Description
Project Details
LUANDA REFINERY COMBINED CYCLE PLANT
Client : Angola Hydraulics
Location : Luanda – Angola
Year of Completion : 2014
This contract was characterized by the execution of civil construction works to support the execution of the Luanda Refinery Combined Cycle Power Plant (Implementation area of 10 280m2), with an installed capacity of 30 MW (two gas turbines and one turbine steam).
Most significant data and quantities:
Reinforced concrete:
Excavation: 4,000 m 3
Concrete: 4,000 m 3
Rebar steel: 312,000 kg
Formwork: 10,000 m 2
Anchor bolts: 400 un
Gutters in reinforced concrete: 250 ml
Metallic structures, including sandwich/simple sheet coatings:
Metallic structure: 150,000 kg
Coatings on facades and roofs: 1,750 m 2
Collaborative sheet : 600 m 2
Exterior infrastructure, including earthmoving:
Excavation in trenches: 3,500 m 2
Carbon steel tubing: 700 ml
Polypropylene tubing: 600 ml
HDPE tubing – electrowelding: 600 ml
Fiberglass
tubing : 500 ml Corrugated tube (medium mesh voltage): 1.000 ml
Prefabricated boxes for the different networks: 150 units
Exterior
fittings , including bituminous paving: Deforestation: 10,280 m 2
Excavation: 1,300 m 3
Bituminous paving: 2,400 m 2
Curb: 1,000 ml
Gravel paving: 3,500 m 2
Paving pave: 325 m 2
Fence: 100 ml
Traffic signs : 20 units
Building finishing works, including the following activities:
Execution of concrete block masonry, plastering and painting/mosaics;
Hydraulic installation works (waste networks and water supply);
Plasterboard partitions and ceilings;
Aluminum locksmiths;
Fire doors.